工程進度規劃與控制

Project Scheduling And Control

學期
107-1
學分
3 學分
當期課號
5304
永久課號
ICV5706
開課單位
土木工程學系
授課教師
曾仁杰
校區
光復
類別
選修
上課時間表
週二
5
13:20–14:10
工程進度規劃與控制
EB107
3 節連堂
6
14:20–15:10
7
15:30–16:20

* 根據陽明交大上課時間表所列

概述

The course intends to offer the basics and advanced materials about project scheduling and control. The key techniques introduced in this course include work breakdown structure, bar chart, critical path method (i.e., CPM, both Arrow-Diagramming Method and Precedence Diagramming Method), resource leveling, time-cost tradeoff, PERT (Program Evaluation and Review Technique), and construction claim analysis for schedule delay.

教學方式

助教:劉家瑜(koko03022001@gmail.com)

評分方式

1.Midterm exam and final exam (60%), homework and team project report (both midterm and final reports) (40%) 2.One to two persons form a project team. The intermediate reports will be required according to the class schedule with annotation of each person’s contribution percentage. Different contribution percentages are required. 3.Homework and intermediate reports need to be hand in by the specified deadline. For a delay of every one day, a 5% will be discounted from the original score for the hand-in. No score will be obtained if the delay is more than one week. Discussion either within the team group or between the groups is welcome. However, plagiarism is strictly prohibited and will obtain zero score for any team member involved.

課程大綱
  • Introduction to Construction Scheduling
  • Work Breakdown Structure
  • Bar Charts (Gantt Charts)
  • Critical Path Method, CPM)-Activity On Arrow(AOA)
  • 要徑法(Critical Path Method, CPM)-Activity On Node(AON)
  • Project scheduling software practice
  • Estimation of activity duration and completion and
  • Resource Distribution and Leveling
  • Project scheduling software practice
  • Team project report (midterm)
  • Time-cost tradeoff
  • Cash flow analysis
  • PERT
  • Project monitoring and control
  • Construction claims
  • Team project report
  • (final)
週次計畫
週次主題
第 1 週Introduction to Construction Scheduling(Project management and project scheduling)
第 2 週Work Breakdown Structure(Construction work breakdown structure and examples) Bar Charts (Gantt Charts)( Bar chart and examples)
第 3 週Critical Path Method, CPM)-Activity On Arrow(AOA)(Activity-On-Arrow method) (Arrow Diagramming Methods)
第 4 週Critical Path Method, CPM)-Activity On Arrow(AOA)(Activity-On-Arrow method (Arrow Diagramming Methods), float analysis, and float derivation)
第 5 週Critical Path Method, CPM)-Activity On Arrow(AOA)(Activity-On-Arrow method (Arrow Diagramming Methods), and float derivation) Critical Path Method, CPM)-Activity On Node(AON)(Activity-On-Node method ) (Precedence Diagramming Methods)
第 6 週Critical Path Method, CPM)-Activity On Node(AON)(Activity-On-Node method ) (Precedence Diagramming Methods)
第 7 週Project scheduling software practice(Microsoft Project: how to define a project and activities with their attributes, and customize the schedule bars and networks) (Class conducted in the Computer Center) (Critical Path Method, CPM)-Activity On Node(AON)(Activity-On-Node method (Precedence Diagramming Methods), float analysis, and float derivation)
第 8 週Project上機(基本、WBS、作業、要徑、網圖美化註解的控制)
第 9 週Team project report (midterm)( Report the progress of team projects )
第 10 週Estimation of activity duration and completion(Different methods to estimate activity duration and completion percentage, and their pros and cons)
第 11 週Resource Distribution and Leveling(Resource conflict, leveling concept, resource histogram, conventional resource leveling technique, Minimum Moment Resource Leveling technique, and evaluation of leveling)
第 12 週Project上機(資源的給派、資源整平,其它)
第 13 週Time-cost tradeoff(Time-Cost Tradeoff basics, technique, and examples) Cash flow analysis(Cash flow analysis, S-curve and control points)
第 14 週Construction claims(Types of construction claims, claim analysis for schedule delay) PERT(Review of basic statistics, PERT basics and analysis
第 15 週Project scheduling software practice(Microsoft Project: how to define work calendars, resource types, resource allocation, resource leveling, customization) (Class conducted in the Computer Center)
第 16 週Team project report
第 17 週元旦放假
第 18 週(final)
教科書

Handout course-pack Optional References: 劉福勳,1996,實用工程進度規劃與控制,漢天下工程管理顧問有限公司。 Project Management: Techniques in Planning and Controlling Construction Projects, by Hira N. Ahuja, S.P. Dozzi and S.M. Abourizk; John Wiley & Sons, Inc.