半導體製造管理
Semiconductor Manufacturing Management
| 節 | 週五 |
|---|---|
2 09:00–09:50 | 半導體製造管理 MB520 3 節連堂 |
3 10:10–11:00 | |
4 11:10–12:00 |
* 根據陽明交大上課時間表所列
This course is intended to introduce the decision-making problems and solution methods on the manufacturing managment for semiconductor fabrication industry (e.g., TSMC and Samsung Semiconductor are example companies of this industry). The decision-making problems include: customer service, supply chain management, tool purchase planning, product mix planing, production scheduling, and shop floor control.The mathematical tools used in solving the decision-making problems include excel, linear programming, simulation, and queuing network. Example problems solved by using these tools shall be well explained in this course. Notice that this course is not intended to introduce the manufacturing process technology of semiconductor products.This course is concerned with manufacturing management decision-making problems.
Prerequisite: Production Management (or Production Planning & Control) or approved by the instructing professor of this course
Teaching Process: (1) Lecturing (2) Paper Presentation, (3) Question-Driven Discussion (4) Lab & Case Study: Simulation, Linear Programming, Queuing Network
(1) Mid-Term/Final Exams: 40% (Individual) (2) Class Participation: 15% (Individual) (3) Homework: 15% (Individual) (4) Lab & Semester Projects: 20% (Group) (5) Paper Presentation: 10% (Group)
| 週次 | 主題 |
|---|---|
| 第 1 週 | **Holiday:Moon Festival |
| 第 2 週 | WK2-1-Course Briefing-R2 WK2-2-Characteristics of Semi Mfg Mgt-R1 WK2-4-Simulation Demo-R1" |
| 第 3 週 | WK3-0-Text Book WK3-1-Bare-wafer WK3-2-Clean Room WK3-3-Devices WK3-4-Thermal Process WK3-5-Photo WK3-6-Ion Implanation WK3-7-Etch WK3-8-CVD-PVD WK3-9-Metallization WK3-10-CMOS Process WK3-11-Device-IC-Layers WK3-Appendix WK3-X-Video-Fab" |
| 第 4 週 | WK4-1-Installation of Flexsim WK4-2-Install Educational Version of Flexsim WK4-3-Simulation-CT-THP Curves WK4-4-HW3 Simulation-SFC1 Simulation-SFC2 *MB415(Computer room)" |
| 第 5 週 | **Holiday:Double Ten Day |
| 第 6 週 | WK6-1-Random Number WK6-2-Poisson Process WK6-3Stochastic Simulation Flexsim WK6-HW4 Simulation-single-exponential Simulation-single-uniform" |
| 第 7 週 | WK7-0-Poisson Process-Review WK7-1-Summary of Experiments WK7-2-Exponential _ WIPcontrol Flexsim-R2 WK7-3-Littles Law WK7-4-HW5 Simulation-Constant Simulation-CONWIP Simulation-single-exponential" |
| 第 8 週 | Paper 1: Wein 1988 (Group 1) P1_Wein_1988 WK8-1-HW-P1-Wein1988-R1 WK8-2-Gamma Distribution Group1 Group1_TF" |
| 第 9 週 | Paper 2: Glassey 1988 (Group 2) P2_Glassey_1988 WK9-1-Wu-Lecture WK9-2-G2-FT WK9-3-G2-Report WK9-4-Glassey_1988_Ref WK9-HW-P2-Glassey_1988" |
| 第 10 週 | Paper 3: Weng 1993 (Group 3) Flexsim-Batch Process-20191114 Group3_report Group3_TF P3_Weng_1993 WK 10-2-Batch Process-Flexsim WK10-3-Thermal Process WK10-4-HW-P3-Weng_1993 WK10-5-Q-Time-MM1-Model" |
| 第 11 週 | Paper 4: Kim 2003 (Group 4) Group 4_Kim _figtable Group 4_Kim P4_Kim_2003_Ref P4_Kim_2003 WK11-1-Kim WK11-HW-P4-Kim2003" |
| 第 12 週 | Paper 5: Dabbas 2001 (Group 5) Dabbas-IJPR-2003 Graphs charts Group5_P5_Dabbas_2001 P5_Dabbas_2001 WK12-Dabbas-IJPR WK12-HW-P5-Dabbas -2001_3" |
| 第 13 週 | Exam1 |
| 第 14 週 | Paper 6: Dabbas 2003 (Group 6) P6_Dabbas_2003 Group6_Dabbas_2003 WK14-1-Line Balance—Example WK14-2-Weekly-Daily SFC-R1 WK14-3-HW-P6-Dabbas IEEE-2003" |
| 第 15 週 | Paper 7: Hung 1996 (Group 7) Group7_LP and Simulation Group7_TF P7_Hung_1996 WK15-1-Production Planning-Terms WK15-2-Production Planning-LP WK15-3-PP-Simplified Framework WK15-4-PP-Real Fab-Framework WK15-5-LP-Formulation WK15-6-LP-Example-A WK15-7-HW-PP WK15-8-HW_P7_For_Reference" |
| 第 16 週 | Paper 8: Hood 2003 (Group 8) Group8_Hood Group8_TF P8_Hood_2003 WK16-HW-P8-Hood-2003" |
| 第 17 週 | Final-Project-Tool planning Simulation-Final-Project-Tool Planning_LP WK17-Final-Project-2020" |
| 第 18 週 | presentation : Group1~8 |
Most lecturing materials are adopted from international journals, which include IEEE Transactions on Semiconductor Manufacturing and some other important production management journal.
- 地點
- Office: MB512 (Management Building II)
- 時間
- (1) 10:00-11:40 (Thu)
- 聯絡方式
- E-mail: mcwu@cc.nctu.edu.tw Campus Phone: 57-31913 (Campus Phone)