物流作業規劃模式
Planning Models for Logistics Operations
| 節 | 週二 |
|---|---|
2 09:00–09:50 | 物流作業規劃模式 A905 3 節連堂 |
3 10:10–11:00 | |
4 11:10–12:00 |
* 根據陽明交大上課時間表所列
Based on mathematical models, the objective of this course is to analyze the problems and present the solution algorithms for the planning and resource scheduling problems in a logistics system. The main issues covered in the course include forecasting analysis, inventory management, production/operations planning, operations scheduling and project planning and scheduling. In particular, the decisions problems for both planning (long-term) and operational (short-term) levels are discussed. In addition, this course not only addresses the problems from the methodology point of view, but also put considerable emphasis on the practical sides of logistics management. Finally, the course incorporates the software package application (e.g., EXCEL) and the programming skill training so as build up students' experience and capability to solve the practical problems that might be encountered in the field.
None.
Lecture
1. Evaluation and Grading Policy: (1) Homework: 20%; (2) Class Participation: 5%; (3) Exam I: 25%; (4) Exam II: 25%; (5) Exam III:25%; The instructor will give in-class lectures unless the University mandates all the courses must be given on-line. All the examinations will be in-class. 2. Pedagogy and other supplementary information (websites, TAs, handouts and/or databases): http://e3.nctu.edu.tw/
- Demand Forecasting
- Inventory Control Problems
- Push and Pull Production Control Systems
- Operations Scheduling
- Project Scheduling
| 週次 | 主題 |
|---|---|
| 第 1 週 | Course Introduction; Demand Forecasting Models |
| 第 2 週 | Demand Forecasting Models |
| 第 3 週 | The aggregate planning problem Solving the aggregate planning problem by linear programming |
| 第 4 週 | Basic EOQ Models and Other deterministic inventory models |
| 第 5 週 | News vendor problem; Lot size – reorder point systems; |
| 第 6 週 | The periodic review model Examination I (Chapters 2, 3 and 4) |
| 第 7 週 | Push vs Pull; MRP basics |
| 第 8 週 | Spring break |
| 第 9 週 | Dynamic lot sizing models; |
| 第 10 週 | Optimal lot sizing for time-varying demand |
| 第 11 週 | Incorporate lot sizing into explosion calculus |
| 第 12 週 | Lot sizing with capacity constraints Examination II (Chapters 5 and 6/Optimal lot sizing ) |
| 第 13 週 | JIT fundamentals; (Parts lectured by online learning) |
| 第 14 週 | The job shop scheduling problem; |
| 第 15 週 | Sequencing rules and results; |
| 第 16 週 | Line balancing; |
| 第 17 週 | Examination III |
| 第 18 週 | Critical path/ Time costing methods; (Online learning) |
Steven Nahmias, Production and Operations Analysis (6/e), McGraw Hill/Irwin, 2009.
- 地點
- Assembly Building One A809: Prof. Ming-Jong Yao
- 時間
- 2 EFG
- 聯絡方式
- Prof. Ming-Jong Yao ext: 57215; myao@nycu.edu.tw