物流作業規劃模式

Planning Models for Logistics Operations

學期
110-2
學分
3 學分
當期課號
5536
永久課號
ITS5012
開課單位
運輸與物流管理學系物流管理碩博士班
授課教師
姚銘忠
校區
光復
類別
選修
上課時間表
週二
2
09:00–09:50
物流作業規劃模式
A905
3 節連堂
3
10:10–11:00
4
11:10–12:00

* 根據陽明交大上課時間表所列

概述

Based on mathematical models, the objective of this course is to analyze the problems and present the solution algorithms for the planning and resource scheduling problems in a logistics system. The main issues covered in the course include forecasting analysis, inventory management, production/operations planning, operations scheduling and project planning and scheduling. In particular, the decisions problems for both planning (long-term) and operational (short-term) levels are discussed. In addition, this course not only addresses the problems from the methodology point of view, but also put considerable emphasis on the practical sides of logistics management. Finally, the course incorporates the software package application (e.g., EXCEL) and the programming skill training so as build up students' experience and capability to solve the practical problems that might be encountered in the field.

先修科目

None.

教學方式

Lecture

評分方式

1. Evaluation and Grading Policy: (1) Homework: 20%; (2) Class Participation: 5%; (3) Exam I: 25%; (4) Exam II: 25%; (5) Exam III:25%; The instructor will give in-class lectures unless the University mandates all the courses must be given on-line. All the examinations will be in-class. 2. Pedagogy and other supplementary information (websites, TAs, handouts and/or databases): http://e3.nctu.edu.tw/

課程大綱
  • Demand Forecasting
  • Inventory Control Problems
  • Push and Pull Production Control Systems
  • Operations Scheduling
  • Project Scheduling
週次計畫
週次主題
第 1 週Course Introduction; Demand Forecasting Models
第 2 週Demand Forecasting Models
第 3 週The aggregate planning problem Solving the aggregate planning problem by linear programming
第 4 週Basic EOQ Models and Other deterministic inventory models
第 5 週News vendor problem; Lot size – reorder point systems;
第 6 週The periodic review model Examination I (Chapters 2, 3 and 4)
第 7 週Push vs Pull; MRP basics
第 8 週Spring break
第 9 週Dynamic lot sizing models;
第 10 週Optimal lot sizing for time-varying demand
第 11 週Incorporate lot sizing into explosion calculus
第 12 週Lot sizing with capacity constraints Examination II (Chapters 5 and 6/Optimal lot sizing )
第 13 週JIT fundamentals; (Parts lectured by online learning)
第 14 週The job shop scheduling problem;
第 15 週Sequencing rules and results;
第 16 週Line balancing;
第 17 週Examination III
第 18 週Critical path/ Time costing methods; (Online learning)
教科書

Steven Nahmias, Production and Operations Analysis (6/e), McGraw Hill/Irwin, 2009.

Office Hours
地點
Assembly Building One A809: Prof. Ming-Jong Yao
時間
2 EFG
聯絡方式
Prof. Ming-Jong Yao ext: 57215; myao@nycu.edu.tw